Kawasaki Versys Forum banner

1 - 3 of 3 Posts

·
Registered
Joined
·
40 Posts
Discussion Starter #1 (Edited)
Just a heads up for anyone heading out to US 129 (a.k.a The Dragon). Tennessee Department of Transportation will be working to stabilize the hillside around mile marker 9.5. We have had a lot of rain in East Tennessee this year and had a small landslide about a week ago. TDOT will be using a traffic light to close one lane and control traffic. They hope to complete the stabilization before the end of August and don't plan to close the road completely.

If you are headed out this way, please keep this in mind and check the link below for any updates. I sincerely hope this doesn't cause any problems for anyone headed out this way on a trip.

http://www.tailofthedragon.com/
 
1 - 3 of 3 Posts
Top